Case Study 1

 

Client: EZY Solutions Ltd

Outsourced Payroll Solutions provider Ezy Solutions Ltd, appointed ConnectPDI to design and deliver their new 6000sqft office space in Aston. The project required extensive meeting and breakout space, whilst increasing desk capacity upwards of 50 desks. The project was delivered on budget and included a number of bespoke build items and quirky finishes to give staff and visitors a wide selection of spaces to choose from.

Key features included:

  • Extensive breakout, with feature walls and furniture.
  • Frameless full height glazed partitions
  • Feature and low energy lighting scheme.
  • Raised floor, bus bar and floor boxes
  • Extensive data and comms
  • Door access, security and AV equipment.

Case Study 2

 

Client: Inform Accounting

ConnectPDI were appointed by Inform Accounting to design and build their new two storey office in Sutton Coldfield. There was a lot of demand on space, and the client wanted a warm and welcoming environment for everybody to feel at home in. Using a mixture of floor and wall coverings and seamless full height glazed partitions we were able to give the feeling of space, enhance the use of day light, and inject colour and warmth in to the design. This was complimented by soft furnishings and wood grained desks and tables.

Key features included:

  • Stylish reception desk.
  • Designer sofas with button detail and wooden legs.
  • Feature flooring and wall colouring.
  • Kitchen and cafĂ© breakout.
  • Acoustic meeting booth.
  • Low energy lighting, power and data.

Case Study 3

 

Client: Academy Transformation Trust

Academy Transformation Trust (ATT) appointed ConnectPDI to deliver a fast rack fit-out for their new office. ATT had seen the results of a previous project ConnectPDI had completed in the same building, and wanted a similar look and feel. The project was not only challenging due to the time constraints, but the office itself was in the building’s roof space meaning ceiling heights varied due to the pitch and staggered dormer windows. ConnectPDI managed to turn the project around on-time, and on-budget within two weeks, including the fitting of seamless full height glass cut to match roof detail, and the fitting of a folding door wall between meeting rooms.

Key features included:

  • 3D modelling to detail design in roof space.
  • Folding door wall.
  • Frameless full height glazed partitions
  • Feature flooring
  • Power and data modifications
  • Kitchen with dishwasher.